<!– Generated by docs/make.jl from the system catalog. Do not edit by hand. –>

Full Catalog of Systems

MatpowerTestSystems

┌──────────────────────────────┬───────────────────────────────────┐
│ Name                          Descriptor                        │
├──────────────────────────────┼───────────────────────────────────┤
│ matpower_ACTIVSg10k_sys      │ ACTIVSg10k Test system            │
│ matpower_ACTIVSg2000_sys     │ MATPOWER ACTIVSg2000 Test system  │
│ matpower_RTS_GMLC_sys        │ Matpower RTS-GMLC Test system     │
│ matpower_case14_sys          │ Matpower Test system              │
│ matpower_case24_sys          │ Matpower Test system              │
│ matpower_case2_sys           │ Matpower Test system              │
│ matpower_case30_sys          │ Matpower Test system              │
│ matpower_case3_tnep_sys      │ Matpower Test system              │
│ matpower_case5_asym_sys      │ Matpower Test system              │
│ matpower_case5_dc_sys        │ Matpower Test system              │
│ matpower_case5_gap_sys       │ Matpower Test system              │
│ matpower_case5_pwlc_sys      │ Matpower Test system              │
│ matpower_case5_re_sys        │ Matpower Test system              │
│ matpower_case5_re_uc_pwl_sys │ Matpower Test system              │
│ matpower_case5_re_uc_sys     │ Matpower Test system              │
│ matpower_case5_strg_sys      │ Matpower Test system              │
│ matpower_case5_sys           │ Matpower Test system              │
│ matpower_case5_tnep_sys      │ Matpower Test system              │
│ matpower_case5_transformer   │ Matpower Test system              │
│ matpower_case6_sys           │ Matpower Test system              │
│ matpower_case7_tplgy_sys     │ Matpower Test system              │
│ matpower_cats                │ Matpower California test system   │
│ matpower_frankenstein_00_sys │ Matpower Frankenstein Test system │
└──────────────────────────────┴───────────────────────────────────┘

PSIDSystems

┌───────────────────────────────────────┬──────────────────────────────────────────────────────────┐
│ Name                                   Descriptor                                               │
├───────────────────────────────────────┼──────────────────────────────────────────────────────────┤
│ 14 Bus Base Case                      │ 14 Bus Dynamic Test System Case                          │
│ 2 Bus Load Tutorial                   │ 2 Bus Base System for load tutorials                     │
│ 2 Bus Load Tutorial Droop             │ 2 Bus Base System for load tutorials with Droop Inverter │
│ 2 Bus Load Tutorial GENROU            │ 2 Bus Base System for load tutorials with GENROU         │
│ 3 Bus Inverter Base                   │ 3 Bus Base System for tutorials                          │
│ OMIB System                           │ OMIB case with 2 state machine for examples              │
│ Three Bus Dynamic data Example System │ Three Bus case for examples                              │
│ WECC 240 Bus                          │ WECC 240 Bus case dynamic data with some modifications   │
│ WECC 9 Bus                            │ WECC 9 Bus System with dynamic gens from Sauer and Pai   │
│ psid_11bus_andes                      │ PSID 11-bus Kundur System compared against Andes         │
│ psid_4bus_multigen                    │ PSID Multiple Generators in Single-Bus Test Case         │
└───────────────────────────────────────┴──────────────────────────────────────────────────────────┘

PSIDTestSystems

┌──────────────────────────────────────────┬──────────────────────────────────────────────────────────────────────────────────────┐
│ Name                                      Descriptor                                                                           │
├──────────────────────────────────────────┼──────────────────────────────────────────────────────────────────────────────────────┤
│ psid_psse_test_avr                       │ PSID AVR Test Cases for PSSE Validation                                              │
│ psid_psse_test_constantI_load            │ PSID Constant Current Load Test Case                                                 │
│ psid_psse_test_constantP_load            │ PSID Constant Power Load Test Case                                                   │
│ psid_psse_test_exp_load                  │ PSID Exponential Load Test Case                                                      │
│ psid_psse_test_gen                       │ PSID GEN Test Cases for PSSE Validation                                              │
│ psid_psse_test_pss                       │ PSID PSS Test Cases for PSSE Validation                                              │
│ psid_psse_test_tg                        │ PSID TG Test Cases for PSSE Validation                                               │
│ psid_test_3rd_indmotor                   │ PSID System with 3rd-order Induction Motor Test Case                                 │
│ psid_test_5th_indmotor                   │ PSID System with 5th-order Induction Motor Test Case                                 │
│ psid_test_droop_inverter                 │ PSID Two Bus Droop GFM Inverter Test Case                                            │
│ psid_test_gfoll_inverter                 │ PSID Two Bus Grid Following Inverter Test Case                                       │
│ psid_test_ieee_9bus                      │ PSID IEEE 9-bus system with Anderson-Fouad Machine Test Case                         │
│ psid_test_indmotor                       │ PSID System without Induction Motor Test Case                                        │
│ psid_test_omib                           │ PSID OMIB Test Case                                                                  │
│ psid_test_pvs                            │ PSID OMIB with Periodic Variable Source Test Case                                    │
│ psid_test_threebus_5shaft                │ PSID Three Bus 5-shaft Test Case                                                     │
│ psid_test_threebus_anderson              │ PSID Three Bus Anderson-Fouad Test Case                                              │
│ psid_test_threebus_genrou_avr            │ PSID Three Bus GENROU with PSAT AVRs Test Case                                       │
│ psid_test_threebus_machine_vsm           │ PSID Three Bus One-d-One-q Machine against VSM Inverter Test Case                    │
│ psid_test_threebus_machine_vsm_dynlines  │ PSID Three Bus One-d-One-q Machine against VSM Inverter Test Case with Dynamic Lines │
│ psid_test_threebus_marconato             │ PSID Three Bus Simple Marconato Test Case                                            │
│ psid_test_threebus_multimachine          │ PSID Three Bus Multi-Machine Test Case                                               │
│ psid_test_threebus_multimachine_dynlines │ PSID Three Bus Multi-Machine with Dynamic Lines Test Case                            │
│ psid_test_threebus_oneDoneQ              │ PSID Three Bus One-d-One-q Test Case                                                 │
│ psid_test_threebus_psat_avrs             │ PSID Three Bus TG Type I and AVR Type II Test Case                                   │
│ psid_test_threebus_simple_anderson       │ PSID Three Bus Simple Anderson-Fouad Test Case                                       │
│ psid_test_threebus_simple_marconato      │ PSID Three Bus Simple Marconato Test Case                                            │
│ psid_test_threebus_vsm_reference         │ PSID Three Bus Inverter Reference Test Case                                          │
│ psid_test_vsm_inverter                   │ PSID Two Bus D'Arco VSM Inverter Test Case                                           │
└──────────────────────────────────────────┴──────────────────────────────────────────────────────────────────────────────────────┘

PSISystems

┌─────────────────────────────────────┬───────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Name                                 Descriptor                                                                                                                            │
├─────────────────────────────────────┼───────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────┤
│ 2Area 5 Bus System                  │ PSI test system with two areas connected with an HVDC Line                                                                            │
│ 5_bus_hydro_ed_sys                  │ 5-Bus hydro economic dispatch data                                                                                                    │
│ 5_bus_hydro_ed_sys_with_targets     │ 5-Bus hydro economic dispatch data with energy targets                                                                                │
│ 5_bus_hydro_uc_sys                  │ 5-Bus hydro unit commitment data                                                                                                      │
│ 5_bus_hydro_uc_sys_with_targets     │ 5-Bus hydro unit commitment data with energy targets                                                                                  │
│ 5_bus_hydro_wk_sys                  │ 5-Bus hydro system for weekly dispatch                                                                                                │
│ 5_bus_hydro_wk_sys_with_targets     │ 5-Bus hydro system for weekly dispatch with energy targets                                                                            │
│ 5_bus_matpower_AGC                  │ matpower 5-Bus system with AGC time series                                                                                            │
│ 5_bus_matpower_DA                   │ matpower 5-Bus system with DA time series                                                                                             │
│ 5_bus_matpower_RT                   │ matpower 5-Bus system with RT time series                                                                                             │
│ AC_TWO_RTO_RTS_1Hr_sys              │ Two Area RTO System Connected via AC with 1-hour resolution                                                                           │
│ AC_TWO_RTO_RTS_5min_sys             │ Two Area RTO System Connected via AC with 5-min resolution                                                                            │
│ HVDC_TWO_RTO_RTS_1Hr_sys            │ Two Area RTO System Connected via HVDC with 1-hour resolution                                                                         │
│ HVDC_TWO_RTO_RTS_5min_sys           │ Two Area RTO System Connected via HVDC with 5-min resolution                                                                          │
│ MTHVDC_two_RTS_DA_sys_noForecast    │ Two RTS systems connected by two multi-terminal HVDC systems                                                                          │
│ RTS_GMLC_DA_sys                     │ RTS-GMLC Full system from git repo for day-ahead simulations                                                                          │
│ RTS_GMLC_DA_sys_noForecast          │ RTS-GMLC Full system from git repo for day-ahead simulations                                                                          │
│ RTS_GMLC_RT_sys                     │ RTS-GMLC Full system from git repo for day-ahead simulations                                                                          │
│ RTS_GMLC_RT_sys_noForecast          │ RTS-GMLC Full system from git repo for day-ahead simulations                                                                          │
│ c_sys5_pjm                          │ 5-Bus system                                                                                                                          │
│ c_sys5_pjm_rt                       │ 5-Bus system                                                                                                                          │
│ modified_RTS_GMLC_DA_sys            │ Modified RTS-GMLC Full system for day-ahead simulations\n            with modifications to reserve definitions to improve feasibility │
│ modified_RTS_GMLC_DA_sys_noForecast │ Modified RTS-GMLC Full system for day-ahead simulations\n            with modifications to reserve definitions to improve feasibility │
│ modified_RTS_GMLC_RT_sys            │ Modified RTS-GMLC Full system for real-time simulations\n            with modifications to reserve definitions to improve feasibility │
│ modified_RTS_GMLC_RT_sys_noForecast │ Modified RTS-GMLC Full system for real-time simulations\n            with modifications to reserve definitions to improve feasibility │
│ modified_RTS_GMLC_realization_sys   │ Modified RTS-GMLC Full system for real-time simulations\n            with modifications to reserve definitions to improve feasibility │
│ sys10_pjm_ac_dc                     │ 10-bus system (duplicate 5-bus PJM) with 4-DC bus system                                                                              │
│ two_area_pjm_DA                     │ 2 Area 5-Bus system                                                                                                                   │
└─────────────────────────────────────┴───────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────┘

PSITestSystems

┌────────────────────────────────────┬───────────────────────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Name                                Descriptor                                                                                                        │
├────────────────────────────────────┼───────────────────────────────────────────────────────────────────────────────────────────────────────────────────┤
│ batt_test_case_b_sys               │ test system for Storage Energy Target formulation(case-b)                                                         │
│ batt_test_case_c_sys               │ test system for Storage Energy Target formulation(case-c)                                                         │
│ batt_test_case_d_sys               │ test system for Storage Energy Target formulation(case-d)                                                         │
│ batt_test_case_e_sys               │ test system for Storage Energy Target formulation(case-e)                                                         │
│ batt_test_case_f_sys               │ test system for Storage Energy Target formulation(case-f)                                                         │
│ c_duration_test                    │ 1 Bus for duration testing                                                                                        │
│ c_fixed_market_bid_cost            │ 1 bus system with a Fixed MarketBidCost Model                                                                     │
│ c_linear_cost_test                 │ 1 Bus linear cost for testing                                                                                     │
│ c_linear_fuel_test                 │ 1 Bus linear fuel curve testing                                                                                   │
│ c_linear_fuel_test_ts              │ 1 Bus linear fuel curve testing                                                                                   │
│ c_market_bid_cost                  │ 1 bus system with MarketBidCost Model                                                                             │
│ c_non_convex_io_pwl_cost_test      │ 1 Bus PWL sos testing                                                                                             │
│ c_pwl_average_cost_test            │ 1 bus CostCurve{PiecewiseAverageCurve} testing                                                                    │
│ c_pwl_average_fuel_test            │ 1 bus FuelCurve{PiecewiseAverageCurve} testing                                                                    │
│ c_pwl_incremental_cost_test        │ 1 Bus PWL incremental cost curve testing                                                                          │
│ c_pwl_incremental_fuel_test        │ 1 Bus PWL incremental (marginal) fuel curve testing                                                               │
│ c_pwl_incremental_fuel_test_ts     │ 1 Bus PWL incremental (marginal) fuel curve testing                                                               │
│ c_pwl_io_cost_test                 │ 1 Bus PWL I/O cost curve testing                                                                                  │
│ c_pwl_io_fuel_test                 │ 1 Bus PWL I/O fuel curve testing                                                                                  │
│ c_pwl_io_fuel_test_ts              │ 1 Bus PWL I/O fuel curve testing                                                                                  │
│ c_quadratic_cost_test              │ 1 Bus quadratic cost for testing                                                                                  │
│ c_quadratic_fuel_test              │ 1 Bus quadratic fuel curve testing                                                                                │
│ c_quadratic_fuel_test_ts           │ 1 Bus quadratic fuel curve testing                                                                                │
│ c_ramp_test                        │ 1-bus for ramp testing                                                                                            │
│ c_sys14                            │ 14-bus system                                                                                                     │
│ c_sys14_dc                         │ 14-bus system with DC line                                                                                        │
│ c_sys5                             │ 5-Bus system                                                                                                      │
│ c_sys5_all_components              │ 5-Bus system with 5-Bus system with Renewable Energy, Hydro Energy Reservoir, and both StandardLoad and PowerLoad │
│ c_sys5_bat                         │ 5-Bus system with Storage Device                                                                                  │
│ c_sys5_bat_ems                     │ 5-Bus system with Storage Device with EMS                                                                         │
│ c_sys5_dc                          │ Systems with HVDC data in the branches                                                                            │
│ c_sys5_ed                          │ 5-Bus System for Economic Dispatch Simulations                                                                    │
│ c_sys5_events                      │ 5-Bus system for testing events                                                                                   │
│ c_sys5_events_rt                   │ 5-Bus system for testing events with real time data                                                               │
│ c_sys5_hy                          │ 5-Bus system with HydroDispatch                                                                                   │
│ c_sys5_hy_cascading_turbine_energy │ 5-Bus system with Cascading HydroTurbines with Energy Reservoirs                                                  │
│ c_sys5_hy_cascading_turbine_head   │ 5-Bus system with HydroTurbine with Reservoir using Head (in meters) data                                         │
│ c_sys5_hy_ed                       │ 5-Bus system with Hydro-Power for Economic Dispatch Simulations                                                   │
│ c_sys5_hy_ems_ed                   │ 5-Bus system with Hydro-Power for Economic Dispatch Simulations                                                   │
│ c_sys5_hy_ems_uc                   │ 5-Bus system with Hydro-Power for Unit Commitment Simulations                                                     │
│ c_sys5_hy_turbine_energy           │ 5-Bus system with HydroTurbine with Energy Reservoir                                                              │
│ c_sys5_hy_turbine_head             │ 5-Bus system with HydroTurbine with Reservoir using Head (in meters) data                                         │
│ c_sys5_hy_uc                       │ 5-Bus system with Hydro-Power for Unit Commitment Simulations                                                     │
│ c_sys5_hybrid                      │ 5-Bus system with Hybrid devices                                                                                  │
│ c_sys5_hybrid_ed                   │ 5-Bus system with Hybrid devices and thermal devices for ED.                                                      │
│ c_sys5_hybrid_uc                   │ 5-Bus system with Hybrid devices and thermal UC devices                                                           │
│ c_sys5_hyd                         │ 5-Bus system with Hydro Energy Reservoir                                                                          │
│ c_sys5_hyd_ems                     │ 5-Bus system with Hydro Energy Reservoir                                                                          │
│ c_sys5_hydro_pump_energy           │ 5-Bus system with hydro pump storage                                                                              │
│ c_sys5_il                          │ System with Interruptible Load                                                                                    │
│ c_sys5_ml                          │ Test System with Monitored Line                                                                                   │
│ c_sys5_pglib                       │ 5-Bus with ThermalMultiStart                                                                                      │
│ c_sys5_pglib_sim                   │ 5-Bus with ThermalMultiStart for simulation                                                                       │
│ c_sys5_phes_ed                     │ 5-Bus system with Hydro Pumped Energy Storage for Economic Dispatch Simulations                                   │
│ c_sys5_pwl_ed                      │ 5-Bus with pwl cost function                                                                                      │
│ c_sys5_pwl_ed_nonconvex            │ 5-Bus with SOS cost function for Economic Dispatch Simulations                                                    │
│ c_sys5_pwl_uc                      │ 5-Bus with SOS cost function for Unit Commitment Simulations                                                      │
│ c_sys5_radial                      │ 5-Bus with a radial branches                                                                                      │
│ c_sys5_re                          │ 5-Bus system with Renewable Energy                                                                                │
│ c_sys5_re_fuel_cost                │ 5-Bus system with Renewable Energy and Fuel Cost TimeSeries                                                       │
│ c_sys5_re_only                     │ 5-Bus system with only Renewable Energy                                                                           │
│ c_sys5_uc                          │ 5-Bus system for Unit Commitment Simulations                                                                      │
│ c_sys5_uc_non_spin                 │ 5-Bus system for Unit Commitment with Non-Spinning Reserve Simulations                                            │
│ c_sys5_uc_re                       │ 5-Bus system for Unit Commitment Simulations with Renewable Units                                                 │
│ case10_radial_series_reductions    │ Test system for radial and series reductions                                                                      │
│ case11_network_reductions          │ Test system for building simulations with network reductions                                                      │
│ hydro_test_case_b_sys              │ test system for HydroGen Energy Target formulation(case-b)                                                        │
│ hydro_test_case_c_sys              │ test system for HydroGen Energy Target formulation(case-c)                                                        │
│ hydro_test_case_d_sys              │ test system for HydroGen Energy Target formulation(case-d)                                                        │
│ hydro_test_case_e_sys              │ test system for HydroGen Energy Target formulation(case-e)                                                        │
│ hydro_test_case_f_sys              │ test system for HydroGen  Energy Target formulation(case-f)                                                       │
│ test_RTS_GMLC_sys                  │ RTS-GMLC test system with day-ahead forecast                                                                      │
│ test_RTS_GMLC_sys_with_hybrid      │ RTS-GMLC test system with day-ahead forecast and HybridSystem                                                     │
└────────────────────────────────────┴───────────────────────────────────────────────────────────────────────────────────────────────────────────────────┘

PSSEParsingTestSystems

┌────────────────────────────────────────────┬────────────────────────────────────────────────────────────────────┐
│ Name                                        Descriptor                                                         │
├────────────────────────────────────────────┼────────────────────────────────────────────────────────────────────┤
│ Base_Eastern_Interconnect_515GW            │ Synthetic Eastern Interconnection system with 515 GW of generation │
│ PSSE 30 Test System                        │ PSSE 30 Test system                                                │
│ isolated_bus_test_system                   │ PSSE isolated bus test system                                      │
│ psse_14_network_reduction_test_system      │ PSSE network reduction test system                                 │
│ psse_14_tap_correction_test_system         │ PSSE tap correction test system                                    │
│ psse_14_zero_impedance_branch_test_system  │ PSSE zero impedance branch test system                             │
│ psse_4_zero_impedance_3wt_test_system      │ PSSE zero impedance 3-winding transformer test system              │
│ psse_ACTIVSg2000_sys                       │ PSSE ACTIVSg2000 Test system                                       │
│ psse_RTS_GMLC_sys                          │ PSSE .raw RTS-GMLC system                                          │
│ psse_ybus_14_test_system                   │ PSSE ybus test system                                              │
│ pti_case10_voltage_winding_correction_sys  │ PSSE case10 winding voltage correction test system                 │
│ pti_case11_with_synchronous_condensers_sys │ PSSE Case 11 with Synch. Condensers                                │
│ pti_case14_sys                             │ PSSE 14-bus Test system                                            │
│ pti_case14_with_interruptible_loads_sys    │ PSSE with interruptible loads Test system                          │
│ pti_case14_with_pst3w_sys                  │ PSSE Case 14 with PST3W                                            │
│ pti_case16_complete_sys                    │ PSSE Case 16 with All Network Components                           │
│ pti_case24_sys                             │ PSSE 24-bus Test system                                            │
│ pti_case30_sys                             │ PSSE 30-bus Test system                                            │
│ pti_case3_sys                              │ PSSE 3-bus Test system                                             │
│ pti_case5_alc_sys                          │ PSSE 5-Bus alc Test system                                         │
│ pti_case5_sys                              │ PSSE 5-Bus Test system                                             │
│ pti_case73_sys                             │ PSSE 73-bus Test system                                            │
│ pti_case7_tplgy_sys                        │ PSSE 7-bus Test system                                             │
│ pti_case8_voltage_winding_correction_sys   │ PSSE case8 winding voltage correction test system                  │
│ pti_frankenstein_00_2_sys                  │ PSSE frankenstein Test system                                      │
│ pti_frankenstein_00_sys                    │ PSSE frankenstein Test system                                      │
│ pti_frankenstein_20_sys                    │ PSSE frankenstein Test system                                      │
│ pti_frankenstein_70_sys                    │ PSSE frankenstein Test system                                      │
│ pti_modified_case14_sys                    │ PSSE Modified 14-bus Test system                                   │
│ pti_modified_case25_v35_sys                │ PSSE Modified 25-bus V35 Test system                               │
│ pti_parser_test_a_sys                      │ PSSE Test system                                                   │
│ pti_three_winding_mag_test_sys             │ PSSE Test system                                                   │
│ pti_three_winding_test_2_sys               │ PSSE Test system                                                   │
│ pti_three_winding_test_sys                 │ PSSE Test system                                                   │
│ pti_two_terminal_hvdc_test_sys             │ PSSE Test system                                                   │
│ pti_two_winding_mag_test_sys               │ PSSE Test system                                                   │
│ pti_vsc_hvdc_test_sys                      │ PSSE Test system                                                   │
└────────────────────────────────────────────┴────────────────────────────────────────────────────────────────────┘

PSYTestSystems

┌─────────────────────────────────┬─────────────────────────────────────────────────────────────────┐
│ Name                             Descriptor                                                      │
├─────────────────────────────────┼─────────────────────────────────────────────────────────────────┤
│ dynamic_inverter_sys            │ PSY test dynamic inverter system                                │
│ psse_240_parsing_sys            │ Test parsing of PSSE 240 Bus Case system                        │
│ psse_3bus_SEXS_sys              │ Test parsing of PSSE 3-bus Test system with SEXS                │
│ psse_3bus_gen_cls_sys           │ Test parsing of PSSE 3-bus Test system with CLS                 │
│ psse_3bus_no_cls_sys            │ Test parsing of PSSE 3-bus Test system without CLS              │
│ psse_Benchmark_4ger_33_2015_sys │ Test parsing of PSSE Benchmark system                           │
│ psse_OMIB_sys                   │ Test parsing of PSSE OMIB Test system                           │
│ psse_renewable_parsing_1        │ Test parsing PSSE 3-bus Test system with REPCA, REECB and REGCA │
│ tamu_ACTIVSg2000_sys            │ TAMU ACTIVSg2000 Test system                                    │
└─────────────────────────────────┴─────────────────────────────────────────────────────────────────┘

SPISystems

┌─────────────────────────────────────────────┬─────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────┐
│ Name                                         Descriptor                                                                                                              │
├─────────────────────────────────────────────┼─────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────┤
│ RTS_GMLC_5min with Static Outage Data       │ 5 minute RTS_GMLC System with Static GeometricDistributionForcedOutage SupplementalAttribute                            │
│ RTS_GMLC_5min with TimeSeries Outage Data   │ 5 minute RTS_GMLC System with GeometricDistributionForcedOutage SupplementalAttribute and Outage Probability TimeSeries │
│ RTS_GMLC_Hourly with Static Outage Data     │ Hourly RTS_GMLC System with Static GeometricDistributionForcedOutage SupplementalAttribute                              │
│ RTS_GMLC_Hourly with TimeSeries Outage Data │ Hourly RTS_GMLC System with GeometricDistributionForcedOutage SupplementalAttribute and Outage Probability TimeSeries   │
└─────────────────────────────────────────────┴─────────────────────────────────────────────────────────────────────────────────────────────────────────────────────────┘